The project consists of the construction of twenty residential townhouses, being the second of a three-staged development. Each townhouse includes a tiled patio, master walk in robe and ensuite, built in robes in the remaining bedrooms, timber look floors, full height tiling to the bathrooms and 2.7 metre ceilings throughout, which is intended to appeal to the owner occupier market.

3 unit/s sold.
Construction is 61.21% complete.
61.21 Complete